CURRENT LOCATION: Home > Products>wire rope electric hoist
Maintenance of Wire Rope Electric Hoists

Maintenance of Wire Rope Electric Hoists

2025-08-06

COLUMN:

TAG: Wire Rope Electric HoistsElectric Hoist

PRODUCT SPECIFICATIONS:

APPLICATION INDUSTRY:

GET FREE QUOTATION

PRODUCT DETAILS

1. Newly installed electric hoists or those installed after disassembly and inspection should first undergo several empty-load test runs. However, do not power on the hoist before installation is complete.

2. Before normal use, perform a static load test at 125% of the rated load, lifting the hoist approximately 100 mm above the ground for 10 minutes to check for proper operation.

3. A dynamic load test involves repeated lifting and lowering and left-right movement at the rated load. After the test, check the mechanical transmission, electrical components, and connections for proper operation and reliability.

REQUEST A QUOTE

X

First Name *

Last Name *

Email Address *

Phone

Company Name *

City *

currentProduct *

Your Message *